Driving Into Kuala Lumpur Dec 2021 4k 60fps Via Smart Tunnel

driving Into Kuala Lumpur Dec 2021 4k 60fps Via Smart Tunnel Youtube
driving Into Kuala Lumpur Dec 2021 4k 60fps Via Smart Tunnel Youtube

Driving Into Kuala Lumpur Dec 2021 4k 60fps Via Smart Tunnel Youtube This is me driving into kuala lumpur early morning on a working day in dec2021. used smart tunnel to get into kl at this hour.i'm on my way to building a big. This is the smart tunnel. entire journey recorded. enjoy!i'm on my way to building a big database of walks, drive arounds and nature videos of malaysia (and.

drive into kuala lumpur 4k 60fps Youtube
drive into kuala lumpur 4k 60fps Youtube

Drive Into Kuala Lumpur 4k 60fps Youtube Drive into kuala lumpur. hope you enjoy!i'm on my way to building a big database of walks, drive arounds and nature videos of malaysia (and maybe soon the wo. In december 2021, smart went into fourth operation mode for the eighth time since its inauguration. at that time, during the heavy rains and subsequent massive flooding that occurred between 16 th and 18 th december, the system diverted 5 million m3 of water during the 22 hours it was activated. The 9.7 km stormwater management and road tunnel or smart tunnel, is a storm drainage and road structure in kuala lumpur, malaysia. it is the longest multi purpose tunnel in the world. it begins at kampung berembang lake near klang river at ampang and ends at taman desa lake near kerayong river at salak south. What is malaysia’s smart tunnel? in its mode 1, the smart tunnel is a 4 km dual deck road infrastructure that connects the areas of jalan istana and kampung pandan (kuala lumpur). it shortens travel time from 15 minutes to just four. in mode 2, a longer tunnel (9 km, which includes the previous 4 km) is activated when there is a storm.

smart tunnel 4k 60fps tunnel That Goes Directly into Heart Of ођ
smart tunnel 4k 60fps tunnel That Goes Directly into Heart Of ођ

Smart Tunnel 4k 60fps Tunnel That Goes Directly Into Heart Of ођ The 9.7 km stormwater management and road tunnel or smart tunnel, is a storm drainage and road structure in kuala lumpur, malaysia. it is the longest multi purpose tunnel in the world. it begins at kampung berembang lake near klang river at ampang and ends at taman desa lake near kerayong river at salak south. What is malaysia’s smart tunnel? in its mode 1, the smart tunnel is a 4 km dual deck road infrastructure that connects the areas of jalan istana and kampung pandan (kuala lumpur). it shortens travel time from 15 minutes to just four. in mode 2, a longer tunnel (9 km, which includes the previous 4 km) is activated when there is a storm. 60 km h. the stormwater management and road tunnel (smart tunnel), e38, is a storm drainage and road structure in kuala lumpur, malaysia, and a major national project in the country. the 9.7 km (6.0 mi) tunnel is the longest stormwater drainage tunnel in southeast asia and second longest in asia. the main objective of this tunnel is to solve. The stormwater management and road tunnel (smart) is the longest tunnel in malaysia and the second longest stormwater tunnel in asia. the 13.2m diameter tunnel consists of a 9.7km stormwater bypass tunnel, with a 4km dual deck motorway within the stormwater tunnel. the main purpose of smart is to solve the problem of flash flooding in kuala.

smart tunnel Straight Thru The Heart Of kuala lumpur 4k 60fps ођ
smart tunnel Straight Thru The Heart Of kuala lumpur 4k 60fps ођ

Smart Tunnel Straight Thru The Heart Of Kuala Lumpur 4k 60fps ођ 60 km h. the stormwater management and road tunnel (smart tunnel), e38, is a storm drainage and road structure in kuala lumpur, malaysia, and a major national project in the country. the 9.7 km (6.0 mi) tunnel is the longest stormwater drainage tunnel in southeast asia and second longest in asia. the main objective of this tunnel is to solve. The stormwater management and road tunnel (smart) is the longest tunnel in malaysia and the second longest stormwater tunnel in asia. the 13.2m diameter tunnel consists of a 9.7km stormwater bypass tunnel, with a 4km dual deck motorway within the stormwater tunnel. the main purpose of smart is to solve the problem of flash flooding in kuala.

Comments are closed.